Renovation quotation template for Singapore

What a proper itemised quotation contains, trade by trade, with the unit each one is priced in and the payment schedule the market expects. Copy the structure, or build it in the tool.

Download the sample PDF

The PDF is a real export from CatchQuote, produced by the same code a customer uses.

What a Singapore renovation quotation has to contain

Every trade on its own line, with a quantity, a unit and a unit price. Never a single lump sum. A lump sum hides where the corners are cut, and it makes a variation impossible to argue about later.

TradeQuoted perWhat the line must say
Hacking and demolitionlot / per itemWhat is being removed and from where. Walls, floor finishes, old carpentry, each listed.
Masonry and tilingper sqftArea, tile size and grade. "Supply and lay" with no area and no grade is not a line item.
Carpentryper foot runLength, height, carcass material and finish. State whether the rate is per row or for top and bottom together.
Plumbing and sanitaryper point / per itemPoints moved or added, and which fittings are supplied by whom.
Electricalper pointCount of each type: socket, lighting point, data, aircon isolator. Rates differ per type.
Ceiling and partitionper sqft / per foot runFalse ceiling area, bulkhead length, cove detail and whether lighting is included.
Paintingper sqft / per roomArea, number of coats, and whether it is a repaint or a fresh unit.
Waterproofingper sqft / per areaWhich wet areas, to what height, and the system used.
Glass and aluminiumper sqft / per itemSize, thickness and whether tempered. Shower screens and windows quoted separately.
Cleaning and permitlotFinal clean, debris removal, and the HDB or MCST permit where one is needed.

Carpentry is the one to watch. A rate quoted per foot run usually means per row, so a kitchen with top and bottom cabinets is twice the figure you first read.

The payment schedule everyone here uses

Four stages, tied to work completed rather than to dates. A quotation that asks for more than 10% up front, or that does not tie payments to stages at all, is worth a question before anything is signed.

10%
On confirmation

The deposit. More than this up front is worth asking about.

40%
After hacking and masonry

The wet works are done and the shell is ready.

40%
On carpentry delivery

The largest single trade, paid when it is installed.

10%
On handover

Held back until the defects list is cleared.

A template gets you one quote. After that it gets in the way.

The structure above is the easy part. What costs the evening is retyping your supplier rates into every new quote, re-doing the maths when a client changes one item, and reformatting the whole thing before it can be sent.

  • Your own rates, once — Import a supplier pricelist as CSV, set your markup, then insert priced lines into any quote.
  • Totals that keep up — Quantity times unit rate, per area, with the discount and GST as their own lines.
  • A PDF that looks yours — Your logo, colours and terms on every quotation, set once.
Ask on WhatsApp

Questions about renovation quotations

What should a renovation quotation include in Singapore?

Every trade as its own line with a quantity, a unit and a unit price: hacking, masonry and tiling, carpentry, plumbing, electrical, ceiling and partition, painting, waterproofing, glass and aluminium, and cleaning and permits. Never a single lump sum.

How is carpentry quoted?

Per foot run, meaning one linear foot measured along the length of the piece at a standard height and depth. Confirm whether the rate covers one row or both top and bottom cabinets, because a kitchen quoted per row costs twice what the headline figure suggests.

Is GST shown separately on a renovation quotation?

It should be. The discount and the GST belong on their own lines under the subtotal, so the client can follow the arithmetic from the line items to the total without taking any of it on trust.

What is the usual payment schedule?

10% on confirmation, 40% after hacking and masonry, 40% on carpentry delivery and 10% on handover. The stages are tied to work completed rather than to dates.

What is the most common problem with a renovation quote?

A lump sum with no breakdown. Without line items there is no way to check quantities, grades or exclusions against the price, and no basis for arguing about a variation once work has started.

Do I need three quotes to compare?

Three itemised quotes compared line by line is the usual advice, and the comparison only works if all three are itemised. Comparing two headline totals tells you which is cheaper and nothing about which is complete.